Our client wanted a build that was specifically for brick and pathing laying as well as a small workshop for repairs and a place to work out of the heat. This photo gives a view of the power wash to the front with generator, pressure washer and 500lt water tank. To the side of this access to the workshop with roller door and self closing gate. This build takes around 300 hours to complete plus paint and electric.