Day: July 1, 2020

1st Year Anniversary

Today is our 12 month anniversary since Andre and I took over OMB. Its been a rollercoaster of a ride to date but boy, what a ride. The company as grown in strength and size and we have our clients, and the whole team to thank for this. We are grateful that we remained open and busy through Covid as some others did not fair well, we hope all bounce back. The group is poised for growth this year so keep your eyes open. From Andre, myself and the team, thank you and here’s to the next twelve months.

Read More »

Fully Dangerous goods prepared

his drum tray is not just run of the mill design. This vehicle will be used for transporting missiles within our military basis and therefore as been fully DG wired and fitted with none static materials to suppress sparks. The undertray wiring is fully enclosed in conduit and all lights have been connected using full DG wiring specifications. The steel tray as been covered in Aluminum and wrapped around all edges to make sure everything that is possible of creating a spark is fully insulated. Try the team at Osborne Motor Bodies if you would like a special build. ombwa.com.au

Read More »